Quick answer
203(k) repair money sits in escrow and is paid in draws after each stage is inspected, with 10% held back until the job is done and the title is clear.
The repair budget in a Federal Housing Administration (FHA) 203(k) loan never lands in your bank account in one lump. The lender holds it in a rehabilitation escrow account and releases it in stages, called draws, as the work is finished and checked. That protects you and the lender from paying for work that never happens.
The U.S. Department of Housing and Urban Development (HUD), which insures 203(k) loans, sets the basic rules. The latest changes came in Mortgagee Letter 2026-06, issued June 23, 2026. Lenders can add their own requirements on top.
203(k) Draw Rules at a Glance
| Limited 203(k) | Standard 203(k) | |
|---|---|---|
| Number of draws | Up to 4 per contractor: closing, up to 2 during the job, final | Up to 5 in total: 4 during the job, 1 final |
| Payments within one draw | Up to 2 disbursements | More than one allowed |
| Holdback | 10% of each draw | 10% of each draw |
| Inspection before payment | Required if repairs exceed $15,000; otherwise receipts or a signed completion letter | Consultant or inspector checks each draw |
| Release after a complete draw request | Within 5 business days | Within 5 business days |
| Who the check is made out to | The contractor, or you and the contractor jointly | You and the contractor jointly, unless you authorize direct payment at each draw |
| Time to finish | 9 months | 12 months |
What Gets Paid at Closing?
Some costs are paid out of the loan on closing day, before any work starts. That usually includes permit fees, consultant and architect fees already incurred, and, where the contractor can’t wait, part of the cost of materials.
Many lenders allow up to 50% of the cost of materials ordered for the job to be paid at closing when the supplier or contractor needs payment up front. Ask your lender what it allows before your contractor orders anything. On a limited 203(k), this closing payment counts as one of the four draws for that contractor.
How Many Draws Do I Get on a 203(k) Loan?
On a limited 203(k), each contractor gets up to four draws, counting the one at closing and the final release. On a standard 203(k), the project gets up to five draws: four during the work and one final.
The limited 203(k) used to allow only two draws per contractor. HUD doubled it in June 2026 so smaller contractors don’t have to carry the cost of a big job until the end. A job that needs more draws than the limit is treated as a major repair and belongs in a standard 203(k), as the comparison of the limited and standard 203(k) explains.
How Does a Draw Request Work?
When a stage of work is finished, the contractor and you sign a draw request, an inspector confirms the work, and the lender pays within five business days of receiving a complete request.
- The contractor finishes a defined stage, such as rough plumbing or roof replacement.
- You and the contractor sign the draw request. On a standard 203(k), the HUD consultant signs too.
- The consultant or inspector visits and confirms the work matches the plan.
- The lender orders a title update when needed, to make sure no one has filed a lien against the home.
- The lender releases the payment, minus the 10% holdback.
On a limited 203(k) with repairs of $15,000 or less, the lender doesn’t have to inspect. It can rely on contractor receipts or a signed Borrower’s Letter of Completion instead, and it can charge you for no more than two third-party inspections per contractor. Above $15,000, completed work must be inspected.
What Is the 10% Holdback?
The lender keeps 10% of each draw until the whole job passes final inspection and a title check shows no liens. It gives the lender, and you, a reason for the contractor to finish the punch list.
The holdback can be skipped for a subcontractor whose part of the job is completely finished, accepted by the inspector and backed by a lien waiver. Otherwise, it is released with the final draw.
Who Is the Check Made Out To?
On a standard 203(k), draw checks go to you and the contractor as co-payees unless you sign a written authorization, at each draw, for the lender to pay the contractor directly. On a limited 203(k), the lender can pay the contractor alone or both of you jointly.
Checks can go to you alone only for materials you bought for work you are doing yourself, or for items you prepaid. HUD finances materials for approved do-it-yourself work but never pays you for your own labor.
What Happens to the Contingency Reserve?
The contingency reserve is a cushion, usually 10% to 20% of the repair budget, for problems found once walls are opened, such as rot or outdated wiring. It is paid out only for those repairs, through the same draw process.
Whatever is left after the final inspection goes toward your loan balance, unless the lender approves using it for more eligible work through a change order. On a standard 203(k), HUD allows the reserve to be spent on extra improvements only under set conditions, including keeping the loan at or below 95% of the after-repair value.
A Sample 203(k) Draw Schedule
Picture a limited 203(k) with one general contractor and a $48,000 contract: a new roof, a furnace, and kitchen updates.
| Draw | When | Work paid | Amount before holdback | Holdback (10%) | Paid out |
|---|---|---|---|---|---|
| 1 | Closing | Half of kitchen materials | $8,000 | $800 | $7,200 |
| 2 | Week 3 | Roof complete | $16,000 | $1,600 | $14,400 |
| 3 | Week 6 | Furnace installed, kitchen rough-in | $14,000 | $1,400 | $12,600 |
| 4 | Week 9 | Kitchen complete, final inspection, title update | $10,000 + $3,800 holdback | none | $13,800 |
| Total | $48,000 | $48,000 |
Because the contract is over $15,000, the lender must inspect the completed work before each payment. A contractor who knows this schedule up front is far more likely to stay on the job.
Why Do 203(k) Draws Get Delayed?
Most delays come from paperwork, not the lender: a missing signature, an unsigned lien waiver, a permit not yet closed or an inspection that found unfinished work.
- Permits. Many lenders won’t release a draw until permits are issued and posted. Skipping them can stall the job and cost more later, as the fines for building without a permit show.
- Lien waivers. Expect to collect them from contractors and major suppliers with each draw.
- Change orders. Any change to the plan has to be approved before the work is paid. On a standard 203(k), HUD caps the consultant’s change order fee at $120.
- Inspection scheduling. Book the inspector as soon as a stage is close to done.
The order of steps from application to final release is laid out in the 203(k) loan process, and the consultant’s part in each draw is covered in what a 203(k) consultant does.
What Should I Do Next?
- Ask your lender for its written draw procedure and inspection fees before you close.
- Agree on a draw schedule with your contractor and attach it to the contract.
- Find out how much, if any, can be paid for materials at closing.
- Keep copies of every signed draw request, receipt and lien waiver.
Frequently Asked Questions
How Long Does It Take to Get a 203(k) Draw Paid?
HUD requires lenders to release funds within five business days of receiving a complete, signed draw request, plus a title update when one is needed.
Can I Get Paid Back for Repairs I Made Before Closing?
Generally no. Repair funds pay for work in the approved plan done after closing. Talk to your lender before doing any work on a home you are buying.
Can the Contractor Be Paid Directly?
Yes. On a limited 203(k), the lender may pay the contractor alone. On a standard 203(k), you have to give written permission at each draw for direct payment.
What Happens if the Contractor Walks Off the Job?
The holdback and unpaid draws stay in escrow. You and the lender can approve a replacement contractor through a change order. Your contract should spell out what happens if work stops.
Sources
- HUD Mortgagee Letter 2026-06, 203(k) draw requests and disbursements (June 23, 2026): www.hud.gov
- HUD Mortgagee Letter 2024-13, revisions to the 203(k) program: archives.hud.gov
- HUD, Single Family Housing Policy Handbook 4000.1: www.hud.gov
General information only, not financial, legal or tax advice. Read our disclaimer