Skip to content

Does the FHA Have a List of Approved Contractors for 203(k) Loans?

By Troy WilliamsUpdated

On this page
  1. 203(k) Contractor Rules at a Glance
  2. Why Doesn’t FHA Approve Contractors?
  3. What Do Lenders Check Before Approving a 203(k) Contractor?
  4. How Do I Find a Good Contractor for a 203(k) Loan?
  5. How Do I Check a Contractor’s License and Insurance?
  6. What Should a 203(k) Contractor Bid Include?
  7. What Questions Should I Ask a 203(k) Contractor?
  8. What Are the Red Flags in a 203(k) Contractor?
  9. What Should I Do Next?
  10. Frequently Asked Questions
  11. Sources

Quick answer

No. The Federal Housing Administration keeps no list of approved 203(k) contractors. Your lender reviews and approves the contractor for each loan.

Plenty of websites advertise contractors as approved by the Federal Housing Administration (FHA) for 203(k) work. No such approval exists. FHA approves lenders and, through the U.S. Department of Housing and Urban Development (HUD), keeps a roster of 203(k) consultants. Contractors are vetted one loan at a time by the lender making it.

That puts the choice in your hands, with the lender checking your work.

203(k) Contractor Rules at a Glance

FHA list of approved contractors Does not exist
Who approves the contractor Your lender, for your loan only
HUD list that does exist 203(k) consultant roster (consultants, not contractors)
Typical lender requirements State or local license where required, liability insurance, tax form (W-9), references, detailed bid
Payment In draws after inspection, usually with 10% held back to the end
Do-it-yourself work Some standard 203(k) loans, with lender approval; HUD never pays for your labor

Why Doesn’t FHA Approve Contractors?

FHA insures the loan; it doesn’t supervise construction. HUD leaves contractor review to lenders and, on standard 203(k) loans, to the HUD-approved consultant who writes the repair plan and checks each stage of work.

The only HUD list connected to contractors is the 203(k) consultant roster. A consultant can be a helpful source of contractor names, but being known to a consultant isn’t an approval either. The consultant’s job is explained in what a 203(k) consultant does.

What Do Lenders Check Before Approving a 203(k) Contractor?

Lenders generally want proof the contractor is licensed where your state or city requires it, carries liability insurance, can provide a W-9 tax form, and has a track record. Many also ask for references and a short history of past jobs.

Each lender sets its own list. Common items:

  • Contractor license number and status, where licensing applies
  • General liability insurance certificate, and workers’ compensation if the contractor has employees
  • W-9 form
  • Two or three references from recent jobs
  • A detailed, itemized bid that matches the repair plan
  • A signed contractor agreement acknowledging the draw and holdback rules

Some lenders keep internal lists of contractors who have finished 203(k) jobs with them. That is a lender convenience, not an FHA approval.

How Do I Find a Good Contractor for a 203(k) Loan?

Start with contractors who have done 203(k) or other inspected, draw-based work before. Ask your lender, a 203(k) consultant, and real estate agents who sell fixer-uppers.

Contractors who have worked with draws know they’ll be paid in stages after inspection, with 10% held back until the end. Contractors who haven’t may balk once they learn the rules. Explain the payment schedule up front, using HUD’s current draw and disbursement rules, and ask directly whether that works for their cash flow.

Get at least two bids on the same scope so you can compare line by line.

How Do I Check a Contractor’s License and Insurance?

Look up the license on your state’s contractor licensing board website, and in some places your city or county’s site. Then ask the insurance company, not just the contractor, to confirm the policy is active.

Licensing rules vary widely. Some states license general contractors, others license only trades like electrical and plumbing, and some leave it to cities. While you’re checking, look for complaints or disciplinary actions. Buyers already checking up on professionals in the deal can use the same habit they would for looking up a real estate agent’s license.

What Should a 203(k) Contractor Bid Include?

A good bid is itemized: each task with its materials, labor and cost, plus permits and a timeline. Vague bids like “kitchen remodel: $35,000” slow approval and invite disputes.

Look for:

  • Each repair listed separately, matching the consultant’s write-up or your lender’s repair list
  • Material grades and quantities (for example, cabinet line, flooring type and square footage)
  • Who pulls and pays for permits
  • A start date within 30 days of closing and an end date within the program deadline (9 months for a limited 203(k), 12 for a standard)
  • A proposed draw schedule tied to finished stages

What Questions Should I Ask a 203(k) Contractor?

  1. How many 203(k) or other draw-based jobs have you finished in the past two years?
  2. Can I call two of those clients?
  3. Are you comfortable waiting for inspections and a 10% holdback?
  4. Who will be on site day to day?
  5. Which work will you subcontract, and will those subcontractors sign lien waivers?
  6. How do you handle surprises such as rot or old wiring found mid-job?

What Are the Red Flags in a 203(k) Contractor?

Walk away from a contractor who asks for large cash payments outside the draw schedule, won’t put the bid in writing, suggests skipping permits, claims to be “FHA-approved,” or offers to write the repair scope and do the work. The last one removes the independent check the program depends on.

Skipping permits is especially costly. Lenders often won’t release draws without them, and the penalties for unpermitted work can follow the house when you sell.

What Should I Do Next?

  1. Ask your lender for its contractor approval checklist.
  2. Get names from your lender, a 203(k) consultant and local agents.
  3. Check the license and insurance of each finalist.
  4. Collect two or more itemized bids on the same scope.
  5. Share the draw schedule with your chosen contractor before you sign.

Frequently Asked Questions

Is There a HUD-Approved 203(k) Contractor List?

No. HUD keeps a roster of 203(k) consultants, not contractors. Any contractor claiming FHA or HUD approval is misstating how the program works.

Can I Use More Than One Contractor?

Yes. Many projects use a general contractor or separate trades. On a limited 203(k), each contractor can receive up to four draws.

Can a Family Member Be My Contractor?

Possibly, if they are licensed where required, insured and approved by your lender. Expect extra scrutiny of the bid.

Can I Be My Own Contractor on a 203(k) Loan?

On some standard 203(k) loans, if your lender agrees and you show the skills. HUD funds materials but doesn’t pay for your labor. Many lenders don’t allow it.

Sources

  • HUD, 203(k) Rehabilitation Mortgage Insurance Program Types: www.hud.gov
  • HUD, 203(k) consultant roster search: entp.hud.gov
  • HUD Mortgagee Letter 2024-13, revisions to the 203(k) program: archives.hud.gov
  • HUD Mortgagee Letter 2026-06, limited 203(k) draws: www.hud.gov

General information only, not financial, legal or tax advice. Read our disclaimer

Still have a question?

Ask a licensed loan officer, CPA or advisor. Answers are free and published so others can learn too.

Ask an expert